STEP 2: INSTALLING THE TOP & BOTTOM TRACKS
1.- Install the top track first. this will be delivered cut to the ordered size minus 2mm for Shaker & minimalist styles only (classic style track is delivered overlength). Decide the fixing positions, drill 5mm holes to suit. set the front face of the top track 2mm from the front edge of the wall liner or end panel. Screw the track throught the prepared holes into the ceiling using suitable screws (not supplied). Avoid overtightenning as this coud distort the top track.
2.- Install the bottom track. decide the fixing positions. Drill 5mm holes to suit. Locate the front edge of the floor track around 30mm back from the front edge of bottom liner so door will hang vertical. Screw the bottom track through the prepared holes into the bottom liner using suitable screws (not supplied).
Top tip: Position the bottom track on the floor or over bottom liner unscrewed, place a door vertically on it and engage on the top track, once you are happy with the door position, screw the bottom track in place. This will ensure vertical positioning of your sliding doors.
